Status: draft, not sent. Written 2026-08-10 by /todo from Todos.md → Chase Fanstel on the BM20C FCC grant. Send as a reply on the existing thread — you emailed them 2026-08-04 and they replied; keeping it in-thread means they have the context and you don't have to reintroduce yourself. Everything asked here is tracked in: Todos.md (the Fanstel step list) and FCC Certification.md §7.

Placeholders to fill: [ORDER NUMBER], [DATE ORDERED], [NAME] if their reply was signed. Nothing else.


Why it is shaped like this

Seven asks is a lot for one email, and a vendor will answer a numbered list where they'd skip a paragraph. So: two sentences of context, then numbers, then nothing. No pleasantries at the end that invite a reply which answers none of them.

The order is deliberate. Items 2–4 are the certification chain, which is what BLK-15 actually turns on. Items 5–7 are cheap for them and save you a board spin.

2026-08-10 — item 1 was answered before this was sent. Fanstel emailed to say both the WM02C and the BM20C are shipping and on their way, which discharges BLK-15's supply half for this order. It is rewritten below into a tracking-number ask rather than deleted, because a carrier and a number are what make "on their way" checkable, and because dropping item 1 would renumber a list whose ordering the rest of this document refers to. The grant half of BLK-15 is untouched by that reply — a module in a box is not a module with an FCC ID.

One thing is deliberately not asked: whether the BM20C will be certified in time. They already answered that as precisely as they are going to ("this month"), and asking again invites the same non-answer. Asking for the grant number instead makes the question falsifiable — either it exists or it doesn't.


Subject

Re: BM20C / WM02C - order status and FCC grant

Body

Hi [NAME],

Thanks for the earlier reply. I went ahead and ordered a BM20C and a WM02C on
[DATE ORDERED], order [ORDER NUMBER], and I am now designing the host board
around them and getting FCC test quotes, so a few specifics would help a lot.

1. Thank you for confirming both modules have shipped. Could you send me the
   carrier and tracking number when you have a moment? I would like to plan the
   bring-up week around the delivery date.

2. Once the BM20C's FCC testing completes, could you send me the grant number
   in writing? My test lab needs it before I can book a slot, and a booking is
   2-6 weeks of lead time, so it is the item on my critical path.

3. With the grant, I will also need the grant conditions and the test report:
   certified antenna type, peak antenna gain, and declared maximum conducted
   power per mode. The draft datasheet (Ver 0.82) does not carry these, and my
   RF exposure calculation currently uses the +8 dBm figure from it. If the
   grant declares something different, I need to know before I file.

4. Can you confirm that the part shipping to me is the part being certified?
   I want to be sure of BM20C rather than BM20BC, and nRF54LM20A rather than
   nRF54LM20B. I noticed your evaluation boards carry the B variant, and I have
   designed for the A.

5. A footprint question. I have pulled BM20-library260729.zip and the BM20C
   specification from your nRF54/70 document page, and they do not quite agree
   with the footprint I have been building to: mine draws the module body as
   14.8 mm long, while the datasheet's 10.3 mm RFI shield plus 5.5 mm antenna
   area comes to 15.8 mm. Which is the dimension I should place the antenna
   keepout against? A millimetre matters here, because the keepout is what
   decides whether the antenna clears the board edge.

6. A layout question neither datasheet answers: my board carries the BM20C and
   the WM02C together, so there are two 2.4 GHz chip antennas on one 40 x 42 mm
   PCB. Is there a minimum separation you require or recommend between them, and
   is it acceptable for both antenna areas to overhang the same board edge? Your
   mounting guidance covers one module on a board and does not address a second
   radiator nearby.

7. On the fallback: if the BM20C timeline slips, I would build a Bluetooth-only
   version. Your datasheet for that part is titled BC15C and my earlier notes say
   BM15C - could you confirm the exact part number I should be ordering? And is
   it genuinely footprint-compatible with the BM20C, or are there differences I
   would need to respin for?

8. Last one, and the smallest: I am using WM02C-Power-Setting_radiotest_prj.txt
   from your nRF54/70 document page for the antenna-gain and band-edge backoff
   CONFIG values, since I understand those settings are part of the module's
   grant conditions. Could you confirm that file is current, and that it is the
   right one for a US Part 15 build? I would rather use your values verbatim
   than transcribe them out of the PDF.

Thank you,

David Macpherson

What to do with the answers

Answer Where it goes
Grant number and status Todos.md → Fanstel block; unblocks OCT-05 booking. Half of BLK-15.
Grant conditions (antenna, gain, max power) FCC Certification.md §5 — re-run the SAR arithmetic if the declared max differs from +8 dBm. The ratio 2.5 has only 0.5 of headroom against the 3.0 threshold, so a +2 dB surprise moves BLE out of exclusion and changes what you're buying from the lab.
Part-number confirmation (A vs B, BM20C vs BM20BC) firmware_spec_v3_nrf.md §1 — the A/B split is an NPU difference and could affect the NCS board target.
BM20C body length (14.8 vs 15.8 mm) Antenna Placement.md §2 and §5 — the BM20C antenna-area coordinates there are drawn from the 14.8 mm silkscreen, and a millimetre moves the keepout.
Antenna separation answer Antenna Placement.md §1 — it replaces the inferred 30 mm, which is currently a range recommendation being used as a design limit. Fanstel's own number beats the inference.
BC15C part number + footprint compatibility BLK-15's fallback line, which currently rests on "to my knowledge."
WM02C CONFIG file firmware_spec_v3_nrf.md §1.1 — it is a grant condition on firmware, and the file is the source of truth over the datasheet table.

If they don't reply within about a week, item 2 is the one to chase by phone rather than email. It is the only item on the critical path — OCT-05 books a lab slot at 2–6 weeks of lead time, and the grant number is what a lab needs before it will take the booking.